KSEB (Kerala State Electricity Board, now formally KSEB Limited) supplies electricity to nearly all of Kerala, billing domestic consumers bi-monthly but assessing tariff slabs on the monthly average of that usage. Below a 250 units/month average, KSEB is telescopic like most Indian DISCOMs; cross that line and it switches to a single flat non-telescopic rate on your entire consumption — Kerala's best-known billing quirk, and the reason this guide is only accurate up to that threshold.

Overview

The Kerala State Electricity Board began functioning on 31 March 1957. Like most state electricity boards, it was converted under the Electricity Act 2003 into a company — Kerala State Electricity Board Limited (KSEBL), incorporated 14 January 2011 and operating independently from 1 November 2013. “KSEB” remains the name most people use on bills and in everyday conversation. KSEBL covers nearly all of Kerala, with three carve-outs: Thrissur Municipal Corporation, Munnar (Kannan Devan Hills), and a handful of small industrial-park zones — each served by its own separate distribution licensee, not modelled on this site.

Takeaway: if your bill doesn't say KSEB/KSEBL, check whether you're in Thrissur city or Munnar before trusting this guide.

Consumer Categories

Our verified data currently covers four KSEB consumer categories, all billed on the same bi-monthly cycle:

CategoryWho it covers
Residential (LT-1A)Households — the category this guide's worked example uses
Commercial (LT-VII A)Shops, hotels, lodges, cold storages and similar
Industrial (LT-IV A)Connected load below 10 kW; two higher tiers exist and aren't modelled
Agriculture (LT-V A)Pumping/lift irrigation for food and cash crops

Takeaway: every rate on this page is per bi-monthly (two-month) cycle unless stated otherwise — the domestic slabs below are shown per monthly average for clarity, since that's what actually determines your rate.

The 250-Unit Non-Telescopic Cliff

Up to a 250 units/month average, KSEB charges telescopically — each slab at its own rate, same as most Indian DISCOMs. The moment your monthly average crosses 250, KSEB re-bills your entire bi-monthly consumption at a single higher non-telescopic rate — not just the units above 250. A 501-unit bi-monthly bill (a 250.5 monthly average) crosses this cliff even though “501” doesn't look close to “250” at first glance, since the threshold is checked against the monthly average, not the bi-monthly total directly.

This guide's tables, worked example and our KSEB calculator all model the telescopic range only. If your monthly average is at or above 250 units, treat every figure here as not applicable to your real bill, not just approximate.

Takeaway: divide your bi-monthly units by two before checking which side of 250 you're on — this is the single most misread number on a KSEB bill.

Domestic Tariff Slabs (Monthly Average)

KSEB bills domestic consumption through five telescopic slabs, effective 1 April 2025, assessed on your monthly-average usage — each band is charged only on the units within it, and only up to the 250-unit cliff above:

Slab (per monthly average)Rate/unit
0–50 units₹3.35
51–100 units₹4.25
101–150 units₹5.35
151–200 units₹7.20
201–250 units₹8.50

A sourcing caveat worth knowing: unusually for this series, these residential slabs are secondary-sourced — cross-checked against a named KSERC order number and date, but pending a primary-document confirmation. KSEB's commercial, industrial and agriculture rates below are the opposite: primary-sourced directly from the KSERC order itself. See how telescopic slabs work for the general mechanic behind this, or plug your own bi-monthly units into the KSEB bill calculator for an instant, itemised estimate.

Takeaway: the first 50 units of your monthly average always cost ₹3.35 each, no matter how much more you use — as long as you're under the 250-unit cliff.

Commercial, Industrial and Agriculture Tariffs

All three are primary-sourced from KSERC Order No. 427/D(T)/2023/KSERC, dated 5 December 2024 (Kerala Gazette Extraordinary Vol. XIII No. 3939), rates effective 1 April 2025 — but each comes with a real caveat worth knowing:

CategoryRate/unitFixed charge
Commercial (LT-VII A)₹6.05 / ₹6.80 / ₹7.50 / ₹8.15 / ₹9.40 across five bands, 0–100/101–200/201–300/301–500/500+ units₹95/month (single-phase)
Industrial (LT-IV A), <10 kW₹5.90 flat₹140/month flat
Agriculture (LT-V A)₹2.40 flat₹20/kW/month

Commercial caveat: KSEB bills this category non-telescopic — your entire month's consumption is charged at the single rate for the slab it falls in, not block-by-block. The table above shows the slab boundaries for reference, but using them telescopically (the way our calculator currently does) will understate a commercial bill above 100 units/month. The rates are also on KSEB's native monthly billing basis, which doesn't match this file's declared bi-monthly cycle — a real, disclosed mismatch, not an error.

Industrial caveat: only the smallest tier (connected load below 10 kW) is modelled here. Load 10–20 kW is billed at ₹5.95/unit with a ₹95/kW/month fixed charge, and above 20 kW it's ₹6.00/unit with ₹215/kVA/month — neither higher tier is in this guide or the calculator. A 20% surcharge also applies if power-factor capacitors aren't installed, not modelled here.

Agriculture caveat: the ₹2.40/unit rate covers LT-V(A) — pumping and lift irrigation for food and cash crops only. A separate LT-V(B) category (livestock, poultry, aquaculture, dairy) is billed higher, at ₹3.40/unit plus ₹30/kW/month, and isn't modelled separately.

Takeaway: outside residential, every category here has at least one real gap — check the caveat for your specific category before trusting the number.

Fixed Charges by Category

KSEB's fixed charge basis varies by category — residential and commercial are per-connection by phase, industrial is a flat monthly amount (for the smallest tier), and agriculture is per kW of connected load:

CategoryBasisRate
ResidentialPer phase, per bi-monthly cycle₹80 (single) / ₹220 (three)
CommercialPer phase, per month₹95 (single) / ₹190 (three)
Industrial (<10 kW)Flat, per month₹140
AgriculturePer kW of connected load, per month₹20/kW

Takeaway: your residential fixed charge depends only on whether you have a single-phase or three-phase connection — it doesn't move with your consumption.

Fuel/Power-Purchase Cost Adjustment — An Open Gap

Many Indian DISCOMs pass through fuel and power-purchase cost changes via a separate adjustment charge on top of the base energy and fixed charges — see fixed charges vs FCA explained for the general mechanism. We don't have a verified, current rate confirming whether KSEB is presently levying one.

Our data shows this as zero, but — unlike this guide's electricity-duty figure below — that isn't a confirmed zero-adjustment policy, just the absence of a modelled value. Treat it as an open gap: your real KSEB bill may carry a charge this guide and calculator don't show.

Takeaway: if your actual KSEB bill runs higher than this guide's worked example even under the 250-unit cliff, an unmodelled fuel adjustment is a plausible reason.

Electricity Duty

Kerala charges a verified 5% electricity duty on the energy charge — one of the more solid figures in our KSEB data, in contrast to the fuel-adjustment gap above. For comparison, Maharashtra's MSEDCL charges a verified 16% and Uttar Pradesh's UPPCL charges a verified 5% as well — see our MSEDCL and UPPCL complete guides. Karnataka's BESCOM and West Bengal's WBSEDCL both have an unverified-duty gap instead — see our BESCOM and WBSEDCL complete guides for that comparison.

Takeaway: KSEB's duty figure is one you can trust — it's the fuel adjustment and the 250-unit cliff that carry the real uncertainty on this bill.

How to Check and Pay Your KSEB Bill

The general path, via KSEB's own portal (exact screens can change over time):

  1. 1Visit the KSEB Web Self Service portal at wss.kseb.in, or open the KSEB Mobile App.
  2. 2Enter your Consumer Number to fetch your current bill.
  3. 3Verify the amount shown and pay via UPI, card or net banking.
  4. 4Save the payment confirmation for your records.

For billing queries or outages, KSEB's helpline is 1912 or 0471-2555544, available 24×7 — this guide and our calculator are estimation tools, not a substitute for your actual bill or KSEB's own portal for account-specific issues.

Takeaway: for anything account-specific — arrears, a disputed reading, whether you've crossed the 250-unit cliff — go to the official portal or helpline directly, not a calculator.

Worked Example: 400 Units, One Bi-Monthly Cycle, Domestic Connection

Using the verified slabs above, here's the full calculation for a single-phase domestic connection using 400 units over one bi-monthly cycle — a 200 units/month average, safely under the 250-unit cliff:

Units consumed (one bi-monthly cycle)400
Monthly average200 (well under the 250-unit cliff)
ConnectionSingle-phase, residential
Slab 1: 100 units (0–100) @ ₹3.35₹335.00
Slab 2: 100 units (101–200) @ ₹4.25₹425.00
Slab 3: 100 units (201–300) @ ₹5.35₹535.00
Slab 4: 100 units (301–400) @ ₹7.20₹720.00
Energy charge subtotal₹2,015.00
Fixed charge (single-phase)₹80.00
Electricity duty (5% of energy charge)₹100.75
Estimated total (per bi-monthly cycle, base structure only)₹2,195.75
Monthly-equivalent (÷ 2)≈₹1,097.88

This ₹2,195.75 covers only the energy charge, fixed charge and electricity duty modelled here — your real bill may also carry an unmodelled fuel/power-purchase adjustment discussed above. Run your own exact units, including any category other than residential, on the KSEB bill calculator— but remember it's only accurate below the 250-unit monthly-average cliff.

Takeaway: always check your monthly average, not just your bi-monthly total, before trusting a KSEB estimate — this example deliberately stays well clear of the 250-unit line.

Frequently asked questions

How is my KSEB electricity bill calculated?

Your domestic KSEB bill adds a telescopic slab-based energy charge (bands from ₹3.35 to ₹8.50/unit, assessed on your monthly-average usage), a fixed charge of ₹80/bi-monthly cycle for single-phase or ₹220 for three-phase, and 5% electricity duty. This only holds below a 250 units/month average — cross it and KSEB switches to a single flat non-telescopic rate on your entire consumption, which this guide and calculator don't model.

What is the 250-unit non-telescopic cliff?

Below a 250 units/month average, KSEB charges telescopically — each slab at its own rate. The moment your monthly average crosses 250, your ENTIRE bi-monthly consumption is re-billed at a single higher non-telescopic rate, not just the units above 250. It's the single most misunderstood rule on a KSEB bill, and this guide's tables and calculator are only accurate below it.

KSEB bills me every two months — how do slabs actually work?

Slab thresholds are assessed on your monthly average (your bi-monthly total ÷ 2), even though you're billed once every two months. A 501-unit bi-monthly bill crosses the 250-unit cliff even though '501' doesn't look close to '250' at first glance — always divide by two before checking which side of the cliff you're on.

What are KSEB's current domestic tariff slabs?

₹3.35/unit for the first 50 units/month, ₹4.25/unit for 51–100, ₹5.35/unit for 101–150, ₹7.20/unit for 151–200, and ₹8.50/unit for 201–250 — each band billed only on the units within it (telescopic), and only valid up to a 250 units/month average. Effective from 1 April 2025.

How confident is this data — is it primary-sourced?

It's mixed, and unusually inverted compared to our other guides: KSEB's commercial, industrial and agriculture rates are PRIMARY-sourced directly from KSERC Order No. 427/D(T)/2023/KSERC (5 December 2024, Kerala Gazette). The residential slabs above, however, are SECONDARY-sourced pending a primary KSERC order cross-check — we're confident in the numbers, but flag this openly rather than overstate our sourcing tier.

Does KSEB charge a fuel or power-purchase cost adjustment?

We don't have a verified current rate either way — our data doesn't confirm whether KSEB is currently levying one, so it isn't modelled in this guide's tables or the calculator. Treat that as an open gap, not a confirmed zero.

What is the electricity duty rate in Kerala?

A verified 5% on the energy charge — this is one of the more solid figures in our KSEB data, unlike the fuel-adjustment gap above.

Does KSEB supply electricity to all of Kerala?

Almost all of it. KSEB Limited (KSEBL) covers the entire state except the Thrissur Municipal Corporation area, the Munnar (Kannan Devan Hills) area, and a handful of small industrial-park licensees, which have their own separate distribution licensees.

How do I check or pay my KSEB bill online?

Visit the KSEB Web Self Service portal at wss.kseb.in, or use the KSEB Mobile App. For queries or outages, call the 24×7 helpline 1912 or 0471-2555544.

What's the difference between KSEB and KSEB Limited (KSEBL)?

The original Kerala State Electricity Board (KSEB), formed in 1957, was converted into a company — Kerala State Electricity Board Limited (KSEBL) — incorporated in January 2011 and operational from 1 November 2013. "KSEB" is still the everyday name most people use.

Prose last reviewed: 16 September 2026. Tariff data refreshed against our own verified records on 29 August 2026. Commercial, industrial and agriculture rates are sourced directly from KSERC Order No. 427/D(T)/2023/KSERC, dated 5 December 2024, effective 1 April 2025. Residential slabs are secondary-sourced pending a primary-document cross-check. Above 250 units/month, KSEB's real non-telescopic regime, the higher industrial/agriculture tiers, KSEB's fuel/power-purchase adjustment, and time-varying agriculture sub-categories are explicitly not modelled pending further sourcing. Rates are revised periodically — the calculator above is kept current; treat this article as the explanatory reference alongside it. See our methodology for how we source and verify tariff data across this site.